Allegation of compliance for condition-level CLIA deficiencies
When a CLIA condition is not met, the laboratory answers with a credible allegation of compliance: a signed statement that the deficiencies have already been corrected, supported by evidence. Unlike a standard-level plan, it cannot rely on future completion dates for the condition or the standards cited under it.

What makes it credible
- It addresses every condition and every supporting standard cited.
- It states that correction is complete and gives the date.
- It covers the same four elements as a plan of correction.
- It is supported by evidence the agency can verify: revised procedures, completed competency assessments, appointment letters, QC and maintenance records, PT investigation reports.
- It is signed by the director or authorized official.
What happens next
The agency verifies the allegation by revisit or, for some deficiencies such as certain personnel and proficiency testing conditions, by reviewing documents. While a condition-level case is open, CMS can impose alternative or principal sanctions under 42 CFR 493.1806. A credible, well-documented allegation is the laboratory's best way to show sanctions are not needed.
Evidence checklist
| Condition area | Typical evidence |
|---|---|
| Director (D6000/D6076) | Documentation of director review activities, onsite visit records, signed procedure approvals, delegation letters |
| Technical consultant or supervisor (D6033/D6108) | Qualification documents, appointment letter with duties |
| Proficiency testing (D2000/D2016) | Enrollment confirmation, event investigation, corrective action, director review |
| Analytic systems (D5400) | QC and calibration records, procedure revisions, verification data |
Need help writing your plan of correction?
Sound Lab Consultants helps laboratory directors work through root causes and write plans of correction and allegations of compliance that answer each D-tag.
Related guides on soundlabconsult.com:
Frequently asked questions
When is an allegation of compliance required?
When the CMS-2567 cites condition-level deficiencies. Standard-level-only findings are answered with a plan of correction.
Can an allegation of compliance include future dates?
No. It asserts the correction has already been made. Future dates are not accepted for the condition or the standards cited under it.
How is an allegation verified?
By a revisit survey or, for some deficiencies, by review of submitted documentation.