Responding to a D-Dimer Deficiency on the CMS-2567
A strong plan of correction for a D-Dimer finding names the fix, shows a look-back for affected patient results, changes the system that failed, assigns monitoring and gives a completion date, with the D-Dimer records that prove it attached.
What a D-Dimer plan of correction should cover
CMS returns plans that only promise to do better. Plans of correction generally need to explain:
- The fix: what was corrected for D-Dimer and when.
- The look-back: how you found other D-Dimer results or patients that may have been affected, and what you did about them.
- The system change: the procedure, training or software change that keeps it from happening again.
- The monitor: who checks it, how often, and where it is reported (for example to the laboratory director or QA meeting).
- The date: a realistic completion date for each item.
Evidence to attach for D-Dimer
- Daily D-Dimer QC records, Levey-Jennings charts, corrective action log, control lot ranges
- Six-month D-Dimer calibration verification and reportable range data with director review
- Twice-yearly D-Dimer accuracy checks (external PT, split samples or reference material) with acceptance criteria
- D-Dimer verification study: accuracy, precision, reportable range, reference interval check, director sign-off
- Critical value list, call log with read-back, report format showing D-Dimer reference intervals
- Training and competency records for everyone who runs D-Dimer
D-Dimer PT and accuracy
Not listed in Subpart I: no required PT, but accuracy must be verified at least twice a year (42 CFR 493.1236(c)). If the finding involves PT, include the investigation of each unacceptable result and the remedial action taken; routine chemistry rules require that documentation be kept for two years (42 CFR 493.841).
Common root causes behind D-Dimer findings
- D-dimer assays use different units (FEU vs. DDU); state units clearly on reports.
- Exclusion cutoffs are assay-specific; document the source of any cutoff you report.
- Procedures that do not match what staff actually do.
- No second-level review of QC and calibration verification records.
Related tests
Full guide: D-Dimer testing in the clinical lab: CLIA, PT and QC requirements on soundlabconsult.com, part of the Laboratory Test Compliance Library.
Need help writing your plan of correction?
Sound Lab Consultants helps laboratory directors work through root causes and write plans of correction and allegations of compliance that answer each D-tag.
Related guides on soundlabconsult.com:
Frequently asked questions
How do I write a plan of correction for a D-Dimer deficiency?
State the correction, the look-back for affected D-Dimer results, the system change, the monitoring and a completion date, and attach the supporting records.
What records support a D-Dimer plan of correction?
Daily D-Dimer QC records, Levey-Jennings charts, corrective action log, control lot ranges; Six-month D-Dimer calibration verification and reportable range data with director review; Twice-yearly D-Dimer accuracy checks (external PT, split samples or reference material) with acceptance criteria.
Where is the plan of correction written?
On Form CMS-2567, the Statement of Deficiencies and Plan of Correction, or in the format your state agency or accrediting organization specifies.
Sources
- Form CMS-2567, Statement of Deficiencies and Plan of Correction
- CMS State Operations Manual, Chapter 6 (Special Procedures for Laboratories)
- 42 CFR 493.1256, Control procedures
- 42 CFR 493.1255, Calibration and calibration verification
- 42 CFR 493 Subpart H, Participation in Proficiency Testing
- CMS State Operations Manual, Appendix C (Laboratories)