Lab CMS-2567 ToolkitPlan of correction process and templates Book a free consultation
Home › Procalcitonin

Responding to a Procalcitonin (PCT) Deficiency on the CMS-2567

A strong plan of correction for a Procalcitonin finding names the fix, shows a look-back for affected patient results, changes the system that failed, assigns monitoring and gives a completion date, with the Procalcitonin records that prove it attached.

Last reviewed Nov 24, 2026 · By the Sound Lab Consultants regulatory team · Sources listed below

What a Procalcitonin plan of correction should cover

CMS returns plans that only promise to do better. Plans of correction generally need to explain:

  1. The fix: what was corrected for Procalcitonin and when.
  2. The look-back: how you found other Procalcitonin results or patients that may have been affected, and what you did about them.
  3. The system change: the procedure, training or software change that keeps it from happening again.
  4. The monitor: who checks it, how often, and where it is reported (for example to the laboratory director or QA meeting).
  5. The date: a realistic completion date for each item.

Evidence to attach for Procalcitonin

Procalcitonin PT and accuracy

Not listed in Subpart I: no required PT, but accuracy must be verified at least twice a year (42 CFR 493.1236(c)). If the finding involves PT, include the investigation of each unacceptable result and the remedial action taken; routine chemistry rules require that documentation be kept for two years (42 CFR 493.841).

Common root causes behind Procalcitonin findings

Related tests

Full guide: Procalcitonin (PCT) testing in the clinical lab: CLIA, PT and QC requirements on soundlabconsult.com, part of the Laboratory Test Compliance Library.

For laboratory compliance and operations only, not medical advice or patient care guidance.

Need help writing your plan of correction?

Sound Lab Consultants helps laboratory directors work through root causes and write plans of correction and allegations of compliance that answer each D-tag.

Book a free consultation

Related guides on soundlabconsult.com:

Frequently asked questions

How do I write a plan of correction for a Procalcitonin deficiency?

State the correction, the look-back for affected Procalcitonin results, the system change, the monitoring and a completion date, and attach the supporting records.

What records support a Procalcitonin plan of correction?

Daily Procalcitonin QC records, Levey-Jennings charts, corrective action log, control lot ranges; Six-month Procalcitonin calibration verification and reportable range data with director review; Twice-yearly Procalcitonin accuracy checks (external PT, split samples or reference material) with acceptance criteria.

Where is the plan of correction written?

On Form CMS-2567, the Statement of Deficiencies and Plan of Correction, or in the format your state agency or accrediting organization specifies.

Sources

More on Lab CMS-2567 Toolkit